← All case studies
Segment
Distribution
Timeline
90 days
Modules used
AI Operations · AI Logistics · AI Insights

How a regional FMCG distributor digitised operations.

A mid-sized FMCG distributor across Southern Africa cut delivery costs by 32% and 2.4× delivery density within 90 days of deploying Lumanw.

Forklift operator moving pallets inside a distribution warehouse

What wasn't working.

The distributor operated 14 trucks across three South African provinces, serving 4,200 retailers across formal and informal channels. Routes were planned manually each morning by dispatch supervisors. Vehicles ran half-empty on outbound legs and returned with capacity that could not be re-sold. Fuel and labour were the two largest cost lines, both growing faster than revenue.

  • Manual dispatch with whiteboards and phone calls — every route plan took two hours
  • No visibility into what each retailer ordered until invoices reconciled at month-end
  • Cash collection tracked on paper — discrepancies surfaced too late to investigate
  • Three regional managers running three different systems, with no unified view

How Lumanw changed it.

Lumanw deployed AI Logistics for fleet and route optimisation, AI Operations for warehouse management, and AI Insights for live performance visibility. The deployment ran in parallel with existing operations for 30 days, then switched fully across all three provinces.

  • AI Logistics planned routes overnight using real-time inventory and order data
  • Driver app gave each driver a turn-by-turn manifest with proof-of-delivery capture
  • AI Operations tracked every SKU through the warehouse with FEFO enforcement
  • AI Insights surfaced bottlenecks and waste in dashboards refreshed every 15 minutes
Results

What changed.

−32%
Delivery cost per drop
2.4×
Drops per route
90d
To full deployment
+18%
Driver productivity
The Impact

The distributor reinvested operating savings into expanding to two new provinces — without buying additional vehicles. Six months later, they were processing 220% of pre-deployment volume on the same fleet, with every route still optimised by Lumanw.

Get started

Could this be your story?

Every operation is different. The system that runs them is the same. Tell us where you are, we'll show you what changes.

Request a Demo